Bangkok, April 5- “The ERC” announces the list of applicants for electricity generation from renewable energy, FiT format, year 2022 – 2030 for the group without fuel costs. and industrial waste
Mr. Komkrit Tantravanich The Secretary-General of the Office of the Energy Regulatory Commission (ERC) revealed that in the past, the ERC has announced a list of applicants for electricity generation who meet the minimum technical readiness score criteria. According to the Pass/Fail Basis according to the ERC Regulation on Electricity Procurement from Renewable Energy in the form of Feed-in Tariff (FiT) 2022 – 2030 for the group without fuel costs, B.E. A total of 386 applicants passed through the selection process. The Energy Regulatory Commission (ERC) at its meeting No. 17/2023 (845th time) on April 5, 2023, has approved the list of applicants for electricity production who have been selected according to the ERC regulations. For the group without fuel costs, 2022, there are 175 people who have passed the selection process, categorizing the fuel types as follows:
For industrial waste fuels, in the past, the OERC has announced a list of applicants for electricity generation who meet the minimum technical readiness score criteria. According to the Pass/Fail Basis according to the ERC Regulation on Electricity Procurement from Renewable Energy in the form of Feed-in Tariff (FiT) 2022 – 2030 for Industrial Waste B.E. 18 cases passed the consideration by the ERC at its meeting No. 17/2023 (No. 845) on 5 April 2023 to approve the list of applicants for electricity generation who have been selected according to the ERC regulations for Industrial Waste B.E.
“The Electricity Authority will send a letter to notify the selected electricity generation applicants and accept the conditions for signing the power purchase agreement by April 19, 2023. The OERC will announce the list of applicants. Submit an application for selected power generation For the group there is no fuel cost. and industrial waste via the ERC website www.erc.or.th by April 5, 2022,” said Mr. Komkrit.-Thai News Agency
Source: Thai News Agency